Skip to content Skip to navigation

Brahmaputra Basin: A neglected basin in India

Brahmaputra basin encompassing North East Region of India is one among the water rich basins in the world. Annual available surface water potential of the region (Brahmaputra-Barak basin) is 585.60 km3, which is 31.33% of the national potential. Surface water potential of Brahmaputra basin is highest of all the river basins in the country (11.54% more than that of Ganga basin). Annual groundwater potential of the region is 26.55 km3, which is 6.15% of the National potential. With geographical area of 7.3% of the total area of India, The basin houses 4.2% population. Annual available water resource of the basin is 31.33% of national potential. Per capita water availability in the Brahmaputra basin is 16589 cum per year, in comparison to national per capita availability is 2208 cum per year. The region has 751% of per capita availability of National average. Erosion potential is very high in the region because the basin is highly undulating and also experiences heavy annual rainfall of about 5100mm to 6400mm in Arunachal Hills and 2500mm to 5400 mm in Brahmaputra plains. As surface water flow through the region, it carries vast amount of sediment also, which is estimated as 735 MTon/year which is equivalent to 2.01 Million Tonnes of sediment everyday.


This vast amount of water is mostly unutilized and cause of flood during monsoon. For decades, hundreds of crores are spent on various plans and programmes for reducing the flood, which have very unfortunately proven to be not effective. One might wonder why all these effort are not functional properly. One of the root causes may be lack of proper hydro-meteorological data and other relevant catchment information while planning all the flood reduction (or control) works. Perhaps it would have been more effective if we had prepared flood reduction or control plans on catchment basis, which is not followed for some unknown reasons. All our plans are curative measures rather than preventive ones. A deeper analysis of the problem might lead us to the fact that there is lack of water resource inventory at catchment level for tributaries of Brahmaputra and Barak rivers. It is noteworthy to mention that these tributaries are responsible for majority of flood, which have their catchments in upper reaches in hills.


Another dimension of water resource related problem in the basin is mono cropping in agriculture. Most of the farmers in entire North East Region can not grow second crop due to non availability of water during winter months and depletion of ground water level. It is perplexing that having so vast amount of water farmers can not grow second crop. This is one of the most challenging task for water resource engineers of the region.


All these could be possible with efforts from R&D, academics, Govt. departments with proper and sufficient infrastructure for ground data collection and basic compilation for all necessary hydrological, meteorological and other relevant parameters. Central Water Commission (CWC) and India Meteorological Department (IMD) have great roles to play in this context. However, very unfortunately proposed restructuring of CWC has given least importance on the Brahmaputra-Barak Basin.


The proposed restructuring gives highest importance on Ganga and Krishna-Godavari basins as shown in the Tables below. Though Brahmaputra-Barak basin is richest in terms of surface water there are 129 hydrological stations whereas there are 360 stations in Ganga basin and 158 stations in Krishna-Godavari basin (32.22% of surface water potential of Brahmaputra-Barak basin) (Table2). Numbers of hydrological stations may suitably be increased in Brahmaputra-Barak basin so that all the tributaries are gauged in proper locations. It is also worthwhile to mention that Brahmaputra river has about 150 numbers of tributaries. These tributaries are not of stream order 1 but orders are up to 5-6. Therefore the number of stations may suitably increased. Owing to high rainfall and highly undulating terrain, stream frequency and drainage density are also very high in comparison to other basins of the country.


Proposed basin wise manpower allocation may also kindly be reviewed. It is observed that manpower proposal for Ganga basin is 2715, which is 273% higher than that for Brahmaputra-Barak basin. Manpower proposal for Krishna-Godavari basin is also 34.6% higher than that for Brahmaputra-Barak basin (Table3).


Financial implications for restructuring has also reflected similar picture. Proposals for Ganga, Brahmaputra-Barak and Krishna-Godavari are 10813.628, 2870.664 and 10417.388 Lakhs respectively (Table4).


Proposed number of basin offices for Ganga, Brahmaputra-Barak and Krishna-Godavari are 859, 259 and 684 respectively (Table5).


It would be scientific and logical if allocations of facilities, manpower and other resources are made proportionate to water resource potential. This will help in making inventory of water resources of hydro-meteorologically rich and sensitive North Eastern Region of India. Understanding hydro-meteorological characteristics of catchments of the tributaries will lead to plans for reducing flood and increasing water use efficiency.


Table1. Basin wise water Resource: (Km3/Yr)

































Basin



Ganga





Brahmaputra & Barak



Krishna



Godavari



Krishna & Godavari



Mahanadi



Surface Water



525.02



585.60



78.12



110.54



188.66



66.88



Ground Water



170.99



26.55



26.41



40.65



67.06



16.46



Table2. Basin wise hydrological stations:
























Basin



Ganga




Brahmaputra & Barak



Krishna



Godavari



Krishna & Godavari



Mahanadi



No of stations



360



129



73



83



156



34



Table3. Basin wise Manpower










































Basin



Upper Ganga



Lower Ganga



Ganga Total



Brahmaputra & Barak



Krishna & Godavari



Mahanadi & Eastern Rivers



Existing manpower



732



1334



2066



612



445



189



Required


manpower



1651



2408



4059



980



2252



868



Proposed manpower



1059



1656



2715



728



980



442



Table4. Financial implications for restructuring: (Rs. In Lakhs)






















Upper Ganga



Lower Ganga



Ganga Total



Brahmaputra & Barak



Krishna & Godavari



Mahanadi & Eastern Rivers



5396.144



5417.484



10813.628



2870.664



10417.388



5767.876



Table5. Basin offices after restructuring

































Upper Ganga



Lower Ganga



Ganga Total



Brahmaputra & Barak



Krishna & Godavari



Mahanadi & Eastern Rivers



Existing



174



111



285



163



125



73



Proposed



429



430



859



259



684



335



Data source for Tables2-5: Restructuring of Central Water Commission, (Volume: I &II), Published by Ministry of Water Resources, Government of India, New Delhi, May, 2011.

Comments

Benjamin Kaman's picture

Suggestions/comments are invited on the proposal of "Restructuring of CWC", from various stakeholders so that their concerns can be taken care while finalizing the proposal. All are requested by CWC to send their views/suggestions in this respect by 30.9.2011 at the following email address (tcodte@nic.in)

Pages

Add new comment

Random Stories

AGP leaders talking to Rajnath Singh

2 Mar 2009 - 7:27am | editor
Six AGP leaders are holding talks with BJP president Rajnath Singh in New Delhi to clear the list of the candidates for the upcoming Lok Sabha polls.The meeting started at around 7-40 on Saturday...

Central team reviewing Assam law and order

15 Feb 2008 - 5:35am | editor
A high level Central team is reviewing Assam’s law and order situation. According to information, led by Union cabinet secretary K M Chandrasekhar the 24 member team is reviewing the...

Japanise Encephalitis patients admitted at Assam Medical College & Hospitel ICU. Photo: UB Photos

Encephalitis toll mounts

10 Jul 2019 - 12:31pm | Dibya J Borthakur
Japanese Encephalitis claimed as many as 64 lives in different parts of the state till Tuesday. The number of affected people reached 265 on Tuesday. State Health minister Himanta Biswa Sarma...

Jurno body condemns attack on Arnab Goswami

24 Apr 2020 - 2:41pm | AT News
Guwahati: Journalists’ Forum Assam (JFA) expresses serious concern over the physical attack on Republic TV editor-in-chief Arnab Goswami along with his wife (Republic TV editor) Samyabrata Ray...

Other Contents by Author

Rural agricultural marketing in North East India is still unorganised and in a poor state though the wheel of time has changed the overall marketing scnerio with trendy adsvertisings.
Krishi Vigyan Kendra Goalpara has conducted a Field Day on "Use of Adjustable Row Marker in Tomato Cultivation" at Lela, Goalpara on 24/06/2011. The programme was organised as a part of Front Line Demonstration (FLD), in which nearly fifty farmers have actively participated. The FLD was undertaken for popularizing mechanization in row marking for vegetable cultivation. All the officials of KVK Goalpara attended the programme and DDM, NABARD also attended as a guest.
Rice is the staple food in the North East Region. Cultivation of rice in the region is mostly rainfed though irrigation also prevails. Increase in food grain production is required to meet demands of increasing population. The drought like situation during crop season necessitates the farming community to be aware and adapt to recent advances on reduced water use for sustained rice production. The actual amount of water used by farmers for land preparation is often several times higher (1200-1500 mm) than the typical requirement (150–250 mm). Several factors cause this high water use. Typical wetland preparation for rice culture involves supplying adequate amounts of water to...
Election Commission Official distributing voter slips to voters for Assembly Election 2011 at Dudhnoi, Goalpara. This is for the first time that the commission is distributing the voter slips by its officials.
Krishi Vigyan Kendra (KVK) Goalpara, a Farm Science Centre run by the National Research Centre on Pig, Indian Council of Agricultural Research (ICAR), Rani, Guwahati, in Goalpara district of Assam is planning to conduct a Technology Week aiming at mass awareness of farmers on the latest advances in Agricultural Technology in the country and diffusion of those technology to the end users. The programme is scheduled to be held with effect from 16th November to 22nd November 2009 at Thekasu, Dudhnoi. The programme will include a Scientific Seminar on ‘Agricultural Technology Intervention for Rural Reconstruction’, launch Workshop of the project ‘Farm Women Empowerment through...
Krishi Vigyan Kendra, Goalpara under the administrative control of National Research Centre on Pig, Rani (Indian Council of Agricultural Research) has taken up special initiatives for improvement of livelihood and nutritional security in Goalpara. The KVK has started a seed production programme for improved variety of Sesamum (var. ST1683) on 2nd April which is ready for harvest now. The expected production of the sesamum is 3 Tons which is two times of total seed requirement for cultivation in Goalpara district. Dr. Anubrata Das, Director National Research Centre on Pig, Rani, visited the farm and expressed satisfaction on the progress. During his visit he also attended three meetings with...
A training cum demonstration on “Farm Mechanization for Improved Agriculture” was organized in Rangjuli on 25thApr’ 2008 by Krishi Vigyan Kendra, Dudhnoi, Goalpara. Nearly thirty farmers from Rangjuli, both men and women actively participated in the programme. The need of farm mechanization is an urgent need of the hour in Assam since there is acute shortage of farm power.Stressing on the need of farm mechanization, Er. Benjamin Kaman cited the example of vast barren lands all around. Drudgery is the root cause of mono cropping in the district, he said. He said that cropping intensity as well as food grain productivity increases with increase in farm power. Increasing...
One of the common features of developing countries in the South East Asia is flash flood in urban areas during rainy season and acute shortage of water for domestic and agricultural uses during winter. Rural areas are situated usually at upstream receives adequate rain, with no facilities to conserve the water for winter. North-East India receives high rainfall of an average of 2000 mm a year with a maximum of 11000 mm in Cherrapunjee. Average annual surface water potential of 585.6 km3 has been assessed in this region, which is highest among all the river systems in India and fifth in the world. Out of this, 24.0 km3 is utilizable water and is merely 4.1% of annual surface water potential...
A training cum demonstration on “Value addition of Tomato” was organized in KVK, Dudhnoi on 7thJan’ 2008 by Krishi Vigyan Kendra, Dudhnoi, Goalpara. Nearly forty women both housewives and youth actively participated in the programme. The trainees represented ten women Self Help Groups from Damra, Upper Borgum, Maju Borgum, and Udaipur.The need of value addition is an urgent need of the hour since the concept of fruit preservation and value addition are new to the peoples of Goalpara district, Mrs. Minakshi Borah Kaman, Home Science specialist said. Goalpara district produces large quantity of fruits and vegetables, most of which neither reach the market nor fetch good...
A training on “Low cost Polyhouse cultivation” was organized on 7th March’ 2008 by Krishi Vigyan Kendra, Dudhnoi, Goalpara. Nearly thirty practicing farmers from Rangjuli, Darrangiri and Dudhnoi participated in the programme. The programme began with inauguration by incharge Mr. Swaroop Sarma, followed by ice breaking session. Course coordinator Er. Benjamin Kaman discussed pros and cons of Low cost Polyhouse cultivation, since the concept of Polyhouse cultivation is new in the Goalpara district. The farmers were been taught all aspects of low cost Polyhouse including site selection, construction, management of microclimate, plant protection aspects and recommended crop...