Skip to content Skip to navigation

Govt body fails to answer RTI query even after 4 years

x

Error message

  • Notice: Undefined index: DraggableCaptchaAnswer in draggable_captcha_generate_refresh() (line 197 of /home/assam1/web/assamtimes.org/public_html/sites/all/modules/draggable_captcha/draggable_captcha.module).
  • Notice: Undefined index: DraggableCaptchaCodes in draggable_captcha_generate_refresh() (line 197 of /home/assam1/web/assamtimes.org/public_html/sites/all/modules/draggable_captcha/draggable_captcha.module).
  • Notice: Trying to access array offset on value of type null in draggable_captcha_generate_refresh() (line 197 of /home/assam1/web/assamtimes.org/public_html/sites/all/modules/draggable_captcha/draggable_captcha.module).

An RTI activist denied information even after 4 years of submitting the RTI application to the RTI cell of Nagaon district administration. According to the RTI activist Bhagyadhar Das of Sirmola village, Gospara, Raha revenue circle, “I filed an RTI query to the Project Director, DRDA, Nagaon asking for the list of beneficiaries under IAY scheme of Hatbor village panchayat of Raha constituency on February 25, 2011 and details of completed works of the same panchayat under NREAGA scheme, but to my utter surprise the concerned authorities still fails to answer my RTI application,” the activist said to this correspondent.

The RTI activist alleged that the Project director and the RTI cell of Nagaon district administration passed the buck on one another denying information while he personally contacted them.

The RTI documents, he received from the DRDA Project Director’s office, Nagaon and the RTI cell of the district administration, Nagaon which are with this correspondent revealed that the abovementioned offices received Das’s RTI application on February 25, 2011. After 2 years, the same offices informed Das through a letter that the office was sending an interim reply and suitable response would be sent to him as soon as any input was received from the units concerned in the office.

Later the RTI cell of Nagaon district administration of India, informed the RTI activist that they were neither the custodians of the RTI information sought by him, nor this information was held by or under the control of this public authority, therefore, cannot be provided by it.

This is a classic example as to how the Government officers protecting their fellow officers tend to frustrate the basic intention of the legislature behind the enactment of the Right to Information Act, 2005," said the RTI activist to this correspondent.

Add new comment

Other Contents by Author

People are seen crossing the river Kopili at Kachua ghat at Chaparmukh under Raha constituency. Government has not yet taken any step to build a concreate bridge even after 63 years of independence.
Hundreds of people on Wednesday evening poured into Pranjal’s home to bid a tearful adieu to the braveheart Pranjal Saikia, who laid down his life at Tongona village under Kakopathar P S fighting militants in March 15 was consigned to flame with full state honour at his native village Dighaliati under Raha Police Station. People crowded at Pranjal’s home soon after the 30 year old Police Sub-Inspector wrapped in the tricolor was received by family members. Tears rent the air as the last journey of Pranjal started from his house in nearby creamation ground around 7.35 p.m. The brother of the martyr lit the pyre. Along with grief stricken family members ,friends,...
The delay in the construction of two bridges at Raha under four-lane express highway project remains a cause for serious concern. The construction of the bridges is, being done by Madhucon, moving at a snail’s pace, putting a large number of vehicle users to hardship. A major part of the highway is also kept blocked with gravel, sand,chips and soil resulting in fatal accidents becoming commonplace on the stretch and traffic snarls becoming routine. Over a dozen two-wheeler riders and pedestrians have been killed in accidents on the badly-maintained roads and bridges on the stretch during the past one year. With the construction of one bridge across river Kolong, the water has...
A three year old baby elephant was brutally killed by a group of senseless mob near Jagiroad in Morigaon district on October 26 . According to the eyewitness,the calf with severe injury missed the herd and was loitering alone with a painful body in the swampy area of a village. Seeing the calf at such a condition, the group of villagers soon attacked the calf with sharp weapons like knife, axe bamboo etc. sticks and beaten it unto death. Experiencing such kind of strange behaviour and to safe its life the elephant calf tried to run away to safer places but the senseless and brutal mob of the village chased it and at last killed the innocent animal for no reason. It might be mentioned...
Traffic movement in the Raha town bazzar area has become extremely difficult due to deplorable road condition for the last 2 years. About 500 dwellers of Raha bazzar area are suffering badly as the Public Works Department (PWD) is not taking any measure to repair the damaged road. With rains adding to the situation , plying of vehicles on this road has now become almost impossible. “ I often move through other way to my office to avoid this damaged road at Raha bazzar area during rainy season. Being a physically challenged person it is a big problem for me as I need to cover a long distance to reach my office.I think the dwellers of the both sides of the road are also equally...
Mobile telephone services throughout Raha have degraded from bad to worse resulting in untold suffering and hardship experienced by the mobile customers for no fault of theirs. Though Bharat Sanchar Nigam Ltd (BSNL),Airtel,Aircel,Vodafone and Reliance are providing services at Raha besides other places of the state,but their service has only been annoying mobile customers of the Raha town for over a month. It may be mentioned that in most of the places of the area , the network of any kind of service providers are still a distant dream. Although there are a good number of mobile towers in the area installed by the aforesaid mobile companies but in true sense , they have not been...
Since its installation ,the frequent failure of an SBI ATM at Raha has created a strong resentment among the public as well as the customers of SBI Raha as they in the time of emergency have to rush either to Nagaon or to other places to withdraw money. The ATM counter installed by SBI, Raha ,at first was expected to be a great help for those who failed their transaction done at SBI Raha branch in time due to heavy rush of customers..But frequent failure of it has caused a lot of inconvenience not only for the customers of Raha alone but also other wayside travelers,businessmen, tourists etc. The residents of Raha as well as the customers of SBI Raha have urged the SBI higher...
In view of growing criminal activities, the Chapormukh Police Outpost was set up to curb the same many years ago.Unfortunately, manpower crisis,lack of vehicles, poor infrustucture are the three major problems being faced by the Outpost since its establishment. This police outpost which alone rendering services to 16 villages and more than 40 kms. area without having even the minimum facilities in their hand. The police outpost is functioning from a small abandoned house consisting of three small rooms with cracked walls,broken roof. Of the three rooms one is for the In-Charge (IC),one for office use and the other for quarter- cum- kitchen. Besides the IC , the police outpost has only 3...
The Raha railway station which was set up during pre-independence period has remained in a pitiable condition for several years.The road to the station from the highway is in dilapidated condition for a long time as a result of which passengers need to carry their bags and bagages on their own causing a great deal of inconvenience. The passengers waiting room in the station is congested having only two concrete benches inside it due to which a large number of passengers have to wait for their respective scheduled trains in the open platform.The passengers also often get wet during rainy season in particular on the eve of arrival of their scheduled train.The station is lack of generator...
The NH-37 passing through Raha town is in a dilapted condition since a long time.The vehicles including all kinds ply daily through Raha to the other places of the state suffering a lot of inconvenience due to the dilapidated condition of the highway at Raha.The widening pathholes have become a virtual death traps for the commuters of different vehicles and pedestrians.The buses need more than one hour to reach Nagaon from Raha instead of the normal time thirty minutes. Talking to this correspondent, the people of the locality showed a strong resentment towards the National Highway authority for not showing any interest to improve the present state of the highway.The heavy vehicles of...