Ranganadi Flood of May 31, 2025: Who is Responsible?

On May 31, 2025, a catastrophic flash flood struck Assam’s Lakhimpur district, triggered by an excessive discharge from the Ranganadi River. The flood inundated 243 villages, claimed the lives of Biren Pawe and Rajkumar Taid in Nowboicha Revenue Circle, and caused extensive damage to infrastructure, agriculture, and livelihoods. This report integrates data from the 2008 flood and the 2017 IIT Guwahati study to analyze the causes of the 2025 flood and assign responsibility for the downstream devastation. The primary trigger was the North Eastern Electric Power Corporation’s (NEEPCO) release of excess water from the 405 MW Panyor Hydro Electric Project (PHEP), compounded by heavy monsoon rainfall, recurrent embankment failures, and ongoing environmental degradation. Historical floods in 2008 (695.20 cumecs, 22 deaths), 2017 (1,412.57 cumecs), and incidents between 2009 and 2015 highlight persistent vulnerabilities and systemic issues in dam management, inadequate warning systems, poor embankment maintenance, and ecological neglect, all contributing to the 2025 disaster.

The Ranganadi River, originating in Arunachal Pradesh’s Dafla Hills, flows through Assam’s Lakhimpur district. The PHEP, operational since 2001, is a run-of-the-river hydropower project with a 68-meter-high dam generating 405 MW. Its inter-basin transfer diverts 160 cumecs to the Dikrong River, reducing Ranganadi’s natural flow and increasing flood risks during spill releases.

Causes of the Unusual Peak Discharge in 2025

  1. Dam Water Release by NEEPCO: The primary cause of the May 31, 2025, flood was NEEPCO’s excessive water release from the PHEP dam. Gate openings escalated from 50 mm on May 29 to 1,250 mm by May 30, exceeding the Ranganadi’s carrying capacity of 1,291 cumecs. This led to a peak discharge that caused the river to overflow by 1:00 AM on May 31. This mirrors the 2008 flood (695.20 cumecs, June 14, 2008) and the 2017 flood (1,412.57 cumecs, July 9, 2017), both driven by sudden releases without adequate downstream coordination. In 2017, NEEPCO’s release surged from 200–300 cumecs on July 8 to over 1,400 cumecs on July 9, as the reservoir reached its maximum level of 567 m, necessitating large releases—a recurring issue in 2025.
  2. Heavy Monsoon Rainfall: Heavy rainfall on May 30–31, 2025, in Lakhimpur and Dhemaji amplified the flood’s severity, as seen in 2008 and 2017, when monsoon rains combined with dam releases overwhelmed the river. Upstream rainfall in Arunachal Pradesh caused sudden inflow surges, necessitating large releases. Had downstream water level data been monitored, the combined impact of rainfall and releases could have been predicted. This highlights the persistent gap in downstream water level monitoring, unaddressed by 2025.
  3. Embankment Failure: The breaching of the Mora Singra guide bund at Atichuk and the “ULFA Embankment” at Aamtola in 2025 inundated 243 villages and National Highway 15. Similar breaches occurred in 2008 (10 locations, 7.8 km collapsed near Ujani Khamti) and 2017 at Noinpur (July 9, 2017, 10:00 PM, water level 95.95 m vs. danger level 95.02 m) and Bogolijan (July 10, 2017, 10:45 PM). Between 2002 and 2014, nearly 43 breaches occurred due to overtopping, erosion, and poor maintenance. Inadequate embankment gradients (1:2 riverside, 1:3 countryside) and incomplete geo-mattress coverage, issues persisting in 2025, worsened the situation. Embankments also confine flow, increase siltation, and raise riverbeds, reducing channel capacity and exacerbating breaches.

Historical Context of Poor Dam and Embankment Management

The Ranganadi’s flood history, 2008 (695.20 cumecs), 2017 (1,412.57 cumecs), and incidents from 2009 to 2015, reflects systemic flaws, identified as follows:

  • Inadequate Inflow Forecasting: Limited rain gauges and a single stream gauging site 10 km upstream, with hourly inflow measurements (updated every three hours), fail to capture the river’s flashy nature.
  • Lack of Flood Cushioning: The PHEP, not designed for flood control, prioritizes power production and maintains the reservoir at 567 m, leading to sudden high releases.
  • Poor Warning Systems: In 2017, NEEPCO’s SMS alerts provided only 2–2.5 hours of lead time, and eight sirens installed in Assam (2009–2010) were partially non-functional due to power and manpower shortages. Residents reported no siren alerts in 2017 or 2025.
  • Sediment Management: Sediment deposition in the river’s central channel forces flow toward embankments, increasing breach risks, as seen in 2008, 2017, and 2025.

Responsibility for the Downstream Havoc

  1. NEEPCO bears primary responsibility for the 2008, 2017, and 2025 floods due to:
    • Inadequate Warning Systems: In 2025, warnings were insufficient, as in 2017 (2–2.5-hour SMS lead time) and 2008 (no effective alerts). Non-functional sirens and lack of downstream coordination exacerbated the issue.
    • Excessive Water Releases: The 2025 release (1,250 mm gate opening), 2017 release (1,412.57 cumecs), and 2008 release (695.20 cumecs) exceeded safe river capacities due to poor inflow forecasting and reservoir management.
  2. The Lakhimpur district administration shares secondary responsibility, as embankment strengthening and siren operationalization were not fully implemented by 2025, perpetuating vulnerabilities seen in 2008 and 2017.

The May 31, 2025, Ranganadi flood, like those in 2008 (695.20 cumecs, 22 deaths) and 2017 (1,412.57 cumecs), was a preventable disaster driven by NEEPCO’s mismanaged dam releases, heavy rainfall, and inadequate infrastructure. The 2017 IIT Guwahati study’s recommendations to improve inflow forecasting, operationalise sirens, and upgrade embankments were largely ignored, perpetuating vulnerabilities. NEEPCO’s primary responsibility, compounded by administrative and policy failures, demands urgent implementation of these measures to protect downstream communities in Lakhimpur.

References

  • Assam Tribune, “Heavy rain, NEEPCO dam release wreak havoc in Lakhimpur; 2 dead, many stranded,” May 31, 2025.
  • Northeast Now, “Assam: NEEPCO dam water wreaks havoc in Lakhimpur; dyke breached, 2 dead,” May 31, 2025.
  • IIT Guwahati, “Flood of North Lakhimpur vis-a-vis Ranganadi Hydropower Project,” February 2018.
  • Assam Times, “Ranganadi: Dam, dyke and flood: Whose responsibility to be fixed?” November 25, 2017.
  • ORF, “Dams as disasters: Are the dams in Arunachal Pradesh aggravating flood damages in Assam?” May 12, 2022.
  • Dialogue Earth, “Dam worsens flood devastation in Assam,” August 25, 2017.
Author info

Keshoba Krishna Chatradhara's picture

Keshoba Krishna Chatradhara is an eminent river activist and social researchers looks after the rivers and dams in northeast from last seventeen years. He can be reached at kkchatradhara@gmail.com.

Add new comment

Other Contents by Author

We are the people living in one of the most vulnerable regions of our country. Our land is rich in natural resources, including minerals and vast forests. Additionally, we are blessed with abundant water resources. However, this abundance often turns into a curse, as flooding and erosion pose serious threats to our communities. While we have developed adaptive capacities to cope with natural flooding, the increasing frequency of unnatural floods and severe erosion—primarily driven by aggressive developmental projects—has left us struggling to adapt. This situation is exacerbated by the lack of awareness and understanding among local leaders regarding the consequences of such developments...
Our concern about the Lower Subansiri HEP project before we die. To the project authority and to the district administration. The river has been drying up. Landslide above the diversion tunnel of the 2000 MW Lower Subansiri Project is more than just a problem with landslides, e-flow, and river health. There are also issues regarding the level of trust between the construction company and the local populace. The NHPC is demonstrating that they hold excessive control over others, limiting the views of those who affected. The maximum flow of River Subansiri is 18000 cum/s. Also, the minimum is about 131 cum/s. The authorities say its flowing with 997 cum/s at the moment. What would...
Gogamukh, Dhemaji: A large police force arrested AJYCP activists, including President Rana Pratap Baruah, General Secretary Palash Changmai, AGS Ratul Borgohin, on Tuesday evening around 7 pm at Gogamukh. The AJYCP has started an indefinite blockade against the Lower Subansiri Hydropower Project on Tuesday morning. The AJYCP is one of the major organizations protesting the big dam over the past decade. They ask to implement the decision taken in the discussion on Lower Subansiri held on December 12, 2014, in Delhi. The discussion in Delhi was chaired by the then Minister of Power, coordinated by Swarbananda Sonowal decided not to start construction work before finding any solution...
On the morning of 27th of May, around 10.30 am, 1785 people of Baghjan village under Hapjan Block of Tinsukia district witnessed their worst nightmare. Something was not right that morning. There was ‘alchemy in the air’ buried in those sounds. The villagers heard a series of booming metallic sounds erupting from a distance. The residents first thought it to be the sound of a jet plane or helicopter in the sky. Assam being prone to floods, and this year was not an exception, their first assumption was that a minister might have come for monitoring the flood situation in the area. However, they soon realised that the loud noise was coming from the drilling oil well site (BGR No 5) of Oil...
Of late, the Ranganadi Hydropower project seems to have generated no less controversy across the state. The controversy erupted when a huge volume of waters unleashed disaster in the form of flood in Lakhimpur where nearly ten people met watery grave. Precisely, the hydro power project started generating electricity from 2002 in the power strapped north eastern state of Assam. The dam of 68 meter height  with 405 MW of generating capacity is based atYajali in Arunachal Pradesh with North Lakhimpur District of Assam in the downstream area where the people at Times, have to bear thr brunt of its adverse impact. This is what the perennial misery for lakhs of people. The brimful...