Skip to content Skip to navigation

Water Management in North East India

One of the common features of developing countries in the South East Asia is flash flood in urban areas during rainy season and acute shortage of water for domestic and agricultural uses during winter. Rural areas are situated usually at upstream receives adequate rain, with no facilities to conserve the water for winter. North-East India receives high rainfall of an average of 2000 mm a year with a maximum of 11000 mm in Cherrapunjee. Average annual surface water potential of 585.6 km3 has been assessed in this region, which is highest among all the river systems in India and fifth in the world. Out of this, 24.0 km3 is utilizable water and is merely 4.1% of annual surface water potential. Culturable area of the basin is about 13.04 MHa, which is 7.1% of the total culturable area of the country. The Brahmaputra River carries heavy sediment load of the order of 799 million tones per annum (fifth severe most in the world), because of friable nature of the hills in its upstream catchment areas, high intensity of rainfall and seismicity in the region. The distribution of water resources potential in the country shows that as against the national per capita annual availability of water as 2208 m3 the average availability in North East because of Brahmaputra and Barak rivers is as high as 16589 m3. However, this vast water resource remains unutilized and creates problems in the entire region in many ways. This necessitates change in perspective of water management in the region.

Rural hilly areas are there at the upstream receiving end and the urban plain areas are usually at down streams. Most of rain occurs during the monsoon and little or no rains during winter. Occurrence of heavy rains during monsoon causes heavy soil erosion in the upstream rural areas in the hills and flash floods in the downstream urban areas. Winter is marked by drought and subsequent lowering of ground water level, both at upstream hills and downstream plains. The water stress leads to lesser cultivation practice during winter in the upstream rural areas. The conventional approach to solve these problems is to take steps by urban and rural boards and authorities separately. However, this is not a scientific approach, because the rural upstream and urban downstream are related hydrologically and thus necessitates an integrated management practice.

Watershed being a geographical area constituted by locations of hydrological interdependency may be taken up for management to bridge the urban and rural division. Integrated watershed management emphasizes on development and utilization of land, vegetation and water for optimum production. Morphological and hydrological parameters are to be evaluated at first and availability of surface and ground water should be assessed at prominent locations in the watershed. Existing land use practices need to be assessed in detail. Management plans should be participatory and active involvement of the end users is essential. The plans should not aim at altering an existing system rapidly; rather a gradual change of the existing system proves better.

In case of small watersheds, conservation of rainwater for winter season can be achieved by construction of water harvesting ponds at mid slope or at foot of the hills. Pond water may be used for irrigation, fishery etc. This enables cultivation during winter also without aid of any rain. On the other hand, it reduces the peak flood of the rivers during monsoon in the downstream urban areas.

Another reason of flood in plains is the reduced carrying capacity of the rivers due to sedimentation of the eroded soil carried from the upstream rural areas. Agriculture being the common land use of every household, adoption of suitable soil conserving practices of cultivation using terraces and bunds supported by vegetative barriers in the hill slopes is advisable to reduce the chances of soil erosion. Small structures may be constructed across the streams to reduce the flow velocity or grassed waterway may be adopted to reduce the channel erosion. Construction of vegetative barriers, retention structures and dams in the upstream hills could be one of the best ways to achieve the goals of reduced flood peak, enhance groundwater recharge by storing flowing out water in the reservoirs, and develop irrigation schemes. Upon having a high head, the dam will also be able to generate electricity.

It can be realized that water being regulated many ways in the upstream areas, cleaner and more uniform river flow is observed in the downstream plains areas. A proper watershed management practice is the best way to bridge the urban/rural division and arrive at all round development of the region considering the entire North East as a unit. The states of the North East region are separated on political grounds, but all are hydrologically interrelated. It is necessary for all state authorities to come forward to a common platform to address the issues related to water resources in order to chalk out plans for holistic development of the region. It will not only intensify agricultural operations but also will reduce flood, create more avenues for employment in both urban and rural areas, feeling of interdependence and brotherhood and above all peace in the region.

Comments

a medhi's picture

Suggestions made through the article are superb for the entire NE, particularly for the Brahmaputra valley as bearing annual flood injuries. To implement the innovative suggestions, a project report with feasibility study incorporating all aspects particularly ecological assessment, a presentation in power point needs to be given to the hon'ble CM, Assam and other NE states including planning commissioners. Expert consultant (may be foreign based) having past experience in this field may be invited to finalize.
Mrinmoy Boruah's picture

Can there be some effort by people outide governments ? NGO, local development society etc. through some self-financing arrangement ? Government runs by the governing minsters and bosses -who at most of the time do not possess required quality, knowledge and wisdom to work on such long term permanent solutions. If we keep looking forward to these people to solve our problem -may be we will remain frustrated and will enrich the media people with our gossip purchase attitudes! 'hope we all can do something on our own!
Anil Kumar Bhuyan's picture

Suggestions included need seriously be viewed..priority is to be paid to the reduced carrying capacity of the rivers..at the instant Assam is the main sufferer and it has to exert to find some ways and means to solve the problem.. frequent change of courses of the rivers resulting with unaccountable damages occur in Assam and other states have least to bother..attention of the Central Govt. in the matter is inevitable though..problem is ours..

Pages

Add new comment

Random Stories

Police Day award

1 Oct 2015 - 5:58am | AT News
The 67th Assam Police Day is being  celebrated on Thursday. Chief Minister Tarun Gogoi is giving away Director General of Police "Commendation Medal" at a function in Kahilipara, Guwahati in the...

ULFA challenges Modi

4 Feb 2014 - 12:29pm | AT News
United Liberation Front of Asom (ULFA) has dared Narendra Modi to withdraw the non Assamese settlers from the state.In a strongly worded statement issued to the media on Tuesday, the outfit said that...

Woman dies post operation

24 Sep 2016 - 9:35pm | AT Kokrajhar Bureau
A 51-year-old woman was died post gall- blooder operation at RNB civil hospital today in Kokrajhar due to wrong treatment. On the other hand, attending doctor said that operation was successfully...

CM meets Guwahati molestation victim

17 Jul 2012 - 2:59am | editor
Chief Minister Tarun Gogoi on Monday met the molestation case victim and promised her more security and monetary relief. He further said that prime accused Amarjyoti Kalita would be arrested soon....

Other Contents by Author

A training cum demonstration on “Farm Mechanization for Improved Agriculture” was organized in Lela village, Dudhnoi on 15th Oct’ 2007 by Krishi Vigyan Kendra, Dudhnoi, Goalpara. Nearly thirty farmers from Lela, both men and women actively participated in the programme. The need of farm mechanization is an urgent need of hour in Assam since there is acute shortage of farm power, in addition we derive only about 20% of our used power from mechanical and electrical sources. Stressing on the need of farm mechanization, Er. Benjamin Kaman presented a comparative picture of farm power availability and food grain productivity in two states of Punjab and Assam. He said that food...