Skip to content Skip to navigation

Delay in construction of two RCC bridges at Raha inconviences road users


The delay in the construction of two bridges at Raha under four-lane express highway project remains a cause for serious concern. The construction of the bridges is, being done by Madhucon, moving at a snail’s pace, putting a large number of vehicle users to hardship. A major part of the highway is also kept blocked with gravel, sand,chips and soil resulting in fatal accidents becoming commonplace on the stretch and traffic snarls becoming routine. Over a dozen two-wheeler riders and pedestrians have been killed in accidents on the badly-maintained roads and bridges on the stretch during the past one year.


With the construction of one bridge across river Kolong, the water has overcome its pollution–related problems posing a grave environmental and health hazard not only to the people by the river side who usually depend on this river but also a serious threat to the acquatic animals. The water is polluting fast because of continued flow of effluents from the machines installed by the river side for the construction work. The people of the area have demanded the state and the central governments and the concering company engaged in the construction work to speed up the work at their earliest.


Comments

Pinku's picture

itz a serious matter..... I know it well.... last time when i went to home nothing was change in the brigde construction over kolong... Modhukon is doing very lazy construction.... All the people of raha should be concern about this...

Pages

Add new comment

Random Stories

Another body found in Beki

11 May 2014 - 8:25am | Jintul Talukdar
Yet another body was recovered in the river Beki on Sunday a week after the BTAD bloodletting.Local residents in Kolgaschia recovered the body of a minor boy in the morning to be fished out with the...

Strange incident in Hajo

18 Apr 2013 - 12:16pm | AT News
In a bizarre incident, a huge number of fishes are found floating dead at a historic pond in Hajo.The scene caught the notice of the local people from Wednesday evening where the fishes started...

Magh Bihu at Munirka, New Delhi

14 Dec 2012 - 8:34pm | editor
After the successful celebration of Magh Bihu last year by us on 13th January 2012 at Dakshin Kalibari, Munirka, New Delhi , we have regrouped together again and decided to continue celebrating this...

Udalguri DC inaugurates science building

11 Apr 2017 - 9:10pm | AT Staff Reporter
The new building of Aryabhatta Science Centre at Kajiamati HS under Udalguri block has recently been inaugurated on April 11 at 1 pm.Sadhana Hojai,Deputy Commissioner,Udalguri formally inaugurated...

Other Contents by Author

Raha : The overall flood situation in Nagaon district remained grave for the second day today as incessent rain has been keeping all the rivers of Nagaon district constantly in spate. The major rivers of Nagaon district Kolong , Kapilee and Barpanee are flowing above danger level. It is learnt from official sources that eighty five villages under Raha Constituency and 10723 hectares area of Paddy fields have been badly damaged by flood water. Many houses have been washed away along with 7 persons which includes 2 children by flood water. Road communication between Baithalongsho and Kampur and Baithalongsho and Hojai have been cut off as surging flood waters inundated several portions of...
Raha, Nagaon: Assam State Transport Corporation(ASTC) bus service from Kampur to Nagaon via Kampur-Raha route was flagged off on August 30 by the divisional superintendent, Apurba Barkakati of ASTC amidst cheers of the local citizens. A meeting was held on the occasion under the presidentship of Bibhuti Bhusan Borthakur, State NSUI president, attended by a number of prominent personalities of Kampur, besides ASTC officials and local people.It should be mentioned here that this service has been demanded by the people of Kampur for a long time.
Raha: The State Forest Minister Rokibull Hussain has at last shown interest to set up the state's first Record Room in Nagaon where all officials and non-officials records of Nagaon district will be preserved in a scientific way. In a recent meeting held at Nagaon Circuit House under the presidentship of RokibullHussain, it has been decided to complete the preservation works within one year. The meeting was attended by the eminent litterateur-journalist Homen Borgohain, Historian Dr Rajen Saikia, scholar Dr Naren Kalita andthe D C of Nagaon Dr J Balaji besides the local citizens and other officials from the administrative section. Later, in a talk with the reporters litterateur-journalist...